In STEP 7 HW Config, why is a maintenance request signaled at the CU320-2 PN / CU310-2 PN when allocating NameOfStation? The MAINT LED of the CPU lights up yellow.

Answer

Fault status:

In the HW configuration in Step 7, a maintenance request is signaled at the CU320-2 PN/CU310-2 PN.The message (under details for the diagnostics) is as follows:
A Name Of station was already configured/allocated for an additional interface of this module,
which is identical to what was entered for this interface.

Cause of the error:

CU3x0-2 PN modules have an IE and a PN interface.
Not only must the addresses of the IE (X127) and the PN interface (X150) be different.
Also, the name of the X127 (r8910) must be different than the name of the X150 (r8930).

Remedy:

Establish a connection to the interface X127 of the CU, and allocate a different name.

Note:



In this particular case, a multi-interface error is signaled in the TIA Portal.

Comments

Popular posts from this blog

SINAMICS G120/ S120: Hardware /Software Change ,Project Upload /Download ,Firmware Upgrade

SINAMICS G120/S120 Hardware /Software Change Project Upload /Download Firmware Upgrade Project Upload/ Download by Starter/ Simotion Scout/BOP The following commissioning tools support the commissioning wizard: STARTER Start drive from V13 SP1 IOP from V1.6 and higher BOP2 If a project is already stored on the CF card, use STARTER to upload it to the PC/PG and make a backup copy if necessary. Upload/Download Procedure with STARTER Inverter → PC/PG To back up the settings with STARTER, proceed as follows: Go online:   Click the "load project to PG/PC" button:   or Target Device>> load project to PG/PC button Wait until STARTER reports that data backup has been completed. Save the project: Go offline:    Click Project >>Archive Button. PC/PG → Inverter Normally this option use when you have changes settings offline or you have old project. To load the settings from the PG to th...

SINAMICS S210: Reset parameters, the safety parameters und the Webserver passwords

SINAMICS S210: Reset parameters, the safety parameters und the Webserver passwords In order to erase the complete parameterization including the Safety parameterization and the Webserver passwords please proceed as follows: Create a file with the name “updater.inf” containing the text “UPDATE_FORMAT_RW 0 1” or download the file from Siemens website. updater.zip (1 KB)  Copy the file “updater.inf” onto an empty SD-Card (max. 2GB, e.g. 6SL3054-4AG00-2AA0). Turn the converter off and insert the SD-Card into the card slot of the converter. Turn the converter back on and wait until the startup of the converter has completed (RDY LED permanently green). Turn the converter off and remove the SD-Card*. Turn the converter back on and perform a new parameterization of the converter – if required – including Safety parameterization and acceptance test. Reset the  Web server passwords,  parameters&  safety parameters ...

SINAMICS S120: Upgrade CU310 to CU310 -2DP_PN

Contents 1.       BACK UP THE EXISTING PROJECT . 2 2.       Upgrade old firmware to new firmware . 2 3.       SWITCH ON THE ELECTRONIC POWER SUPPLY . 3 4.       ESTABLISH THE NETWORK CONNECTION (HARDWARE) 3 5.       CONFIGURE THE NETWORK CONNECTION (SOFTWARE) 3 6.       Download to New Drive . 5 1.     BACK UP THE EXISTING PROJECT If a project is already stored on the CF card, use STARTER to upload it to the PC/PG and make a backup copy if necessary. 2.     Upgrade old firmware to new firmware If the firmware has a new device version you must also select the relevant drive unit in the STARTER project tree and then select the required device version by clicking on menu options Target device >> Device version with the right mouse button: 3.  ...